Assembly Process - Table of Contents
Entries by Title
Click on an entry title below to view the full text of that entry.
- 01. Lower Rail layout
- 02. Front End Assembly
- 03. Front End Applied to Lower Rails
- 04. Design Change on-the-fly
- 05. Top Rail Layout
- 06. Vertical Uprights - Firewall
- 07. Ready for Inspection
- 08. Vertical Uprights - Dashboard
- 09. Rear Bulkhead Sides
- 10. Rear Bulkhead Top Rail
- 11. Rear Bulkhead Supports
- 12. Rearend Bottom Layout
- 13. Rearend Bottom Kick-up
- 14. Rearend Lower Tube
- 15. Rear Bulkead Support - Aft
- 16. Rearend Lower Tube Support
- 17. Rearend Upper Tube
- 18. Cockpit Door Sill
- 19. Tunnel Front Uprights
- 20. Tunnel Lower Cockpit Rails
- 21. Tunnel Bulkhead Cross Rail
- 22. Tunnel Lower Front Rails
- 23. Tunnel Upper Front Rails
- 24. Chassis Tubing Ends
- 25. Rear Axle
- 26. Trailing Arms
- 27. Trailing Arm Bushings
- 28. Trailing Arm Brackets - Axle
- 29. Trailing Arm Brackets - Chassis
- 30. Rear Panhard Support
- 31. Panhard Axle Bracket
- 32. Panhard Chassis Bracket
- 33. Panhard Rod
- 34. Preparing Front Struts
- 35. Converting Struts to Uprights
- 36. Lower Control Arms
- 37. Upper Control Arms
- 38. Front Coil-over Shocks